2022 HP Cases

HP22-01 106 & 110 E MAIN. THE REPLACEMENT OF ALUMINUM WINDOW AND DOOR TRIM. THE INSTALLATION OF TYPE E INSULATED GLAZING WITH BRONZE TINT, AND TWO 3′ X 7′ DOORS. THE INSTALLATION OF NEW BLACK WAREHOUSE LIGHTS BETWEEN THE UPPER WINDOWS TO ILLUMINATE EXISTING LETTERING AT 106 & 110 E MAIN.

HP22-02 13 N WASHINGTON ST. TUCK-POINT BRICK RESTORATION, AND THE REPLACEMENT OF TRANSOM WINDOWS AND AN AWNING. THE RESTORATION OF TWO COLUMNS ON THE FRONT FACADE WHICH INCLUDES REMOVING THE FACADE OFF ONE OF THE COLUMNS AT 13 N WASHINGTON ST.

HP22-03 122 WEST MAIN. THE REPLACEMENT OF A DOUBLE SWING DOOR WITH A NEW SINGLE SOLID DOOR, AND THE REPLACEMENT OF ROTTEN WINDOW FRAMES AND WINDOWS ON THE FRONT AND REAR FAÇADE AT 122 WEST MAIN.

HP22-04 202 CADDO ST NE. THE INSTALLATION OF NEW METAL FRAME WINDOWS, A LARGE OPENING, AND TWO METAL AWNINGS WITH WOOD SKIRTING AT 202 CADDO ST NE.

HP22-05 32 MILL ST. INSTALLATION OF A WALL MOUNTED METAL SIGN ON THE SOUTH FACADE OF THE BUILDING, AND THE INSTALLATION OF A WALL MOUNTED MAILBOX ON THE FRONT DOOR AT 32 MILL ST.

HP22-06 5 & 7 WEST MAIN ST. THE INSTALLATION OF A SIGN; INSTALLATION OF A NEW EXIT DOOR AND EXTERIOR STAIRS; THE REPAIR OF HISTORIC WINDOWS AND THE REPLACEMENT OF GLASS; THE INSTALLATION OF TWO NEW AWNINGS; THE INSTALLATION OF NEW HISTORIC STOREFRONTS; THE REPAIR OF LEADER HEADS; AND THE REPAIR OF BRICK ON THE FRONT AND REAR FACADES AT 5 & 7 WEST MAIN ST.

HP22-07 128 WEST MAIN. THE INSTALLATION OF A SIGN TO THE FRONT FACADE OF THE BUILDING, AND THE REPAINTING OF THE GREEN AND WHITE PAINT ON THE FRONT FACADE AT 128 WEST MAIN.

HP22-08 103 WEST MAIN. THE INSTALLATION OF A SIGN TO THE FRONT FACADE OF THE BUILDING AT 103 WEST MAIN.